Critical Power for High Security Psychiatric Hospital

Critical Power for High Security Psychiatric Hospital

Case Study

Featured image for the article

During a scheduled service visit a Dale engineer discovered remedial work was required on the E800 Series UPS which provides back up power to a psychiatric hospital in the West Midlands.

Instead of hiring a generator to provide backup power, work was carried out during a planned power down at the site as this was more cost effective for the client.

Dale’s Solution

Whilst preparing for the planned work, discussion with the client highlighted a further need for back up power at a sister site.

Dale engineers surveyed the site and developed a disaster recovery plan to quickly install a hire set should the sister site lose power.

Our Results

Remedial work was carried out on the E83320B8 UPS sited at the psychiatric hospital during a scheduled power down.

The sister site is regularly surveyed and any updates made to the plan.