Retrofit Rectifiers for North Sea Platform – Offshore Project

Retrofit Rectifiers for North Sea Platform – Offshore Project

Case Study

Featured image for the article

The client had concerns over the obsolescence of a legacy Erskine Dual Modular DC UPS which had been in situ on a North Sea oil platform for a number of years.

Dale’s Solution

• New, replacement rectifiers and batteries  retrofitted with 2 pre-assembled 19” chassis’ and subcomponents

• High efficiency rectifiers fitted with minimal cost and disruption, while preserving all existing site cabling

• Meticulous planning and exacting design ensured replacement items could slot into the system

• System was fully tested before being dismantled into subcomponents, palletised and shipped

• Original batteries replaced with alternative low maintenance batteries

• Innovative new UPS control display slotted into existing space

Our Results