Dale Power Solutions has become a leader in bringing technology and engineering together to create innovative solutions.

Pharmaceutical Company receives ALoMCP funding to make necessary generator updates

A large pharmaceutical client with bespoke critical power equipment needed to update their generator protection device settings to meet new requirements outlined in the Distribution Code.

The Distribution Code required that updates were made to the generators connected to the National Grid, to make them less sensitive to disturbances in the electricity network and improve network resilience.

The regulations affected every form of non-domestic generation connected to the electricity network installed before February 2018 and with a capacity of between 10 kW and 50 kW.

Dale Power’s Solution

Dale Power Solutions offer a complete service including site survey, recommendations, supply and installation

Dale Power Solutions’ engineers supported the internal engineering team to make the necessary updates

Relays on 6 main generators were upgraded to meet the requirements

Our Results